Post-construction cleaning removes the fine dust and residue left after building work or renovation: paint and plaster splashes, silicone and sticker residue, dusty cupboards, windows and frames, and floors. Because construction dust settles again, the work is done in stages with suitable equipment. The price depends on the floor area and the level of residue.
What's included?
- Removal of fine construction dust from all surfaces
- Paint, plaster and silicone residue
- Windows, frames and window tracks
- Inside and outside of cupboards
- Bathroom and kitchen fittings
- Floors cleaned in several passes
How we work
- 1Check with photos
We assess the floor area and residue from photos or a visit.
- 2Dry dust removal
Dust is removed with suitable vacuums before any wet cleaning.
- 3Residue and details
Paint, plaster and silicone are removed with surface-safe methods.
- 4Final cleaning
Floors and surfaces are cleaned again so the dust doesn't come back.
What does the price depend on?
- Floor area (m²)
- Amount of dust, paint and plaster residue
- Number of windows and frames
- Whether the cupboards and kitchen are installed
Last updated: November 10, 2026




